On August 1 at 11.14 the first of 30 wells was spudded on the Johan Castberg field in the Barents Sea.

The drilling is carried out by the winter-adapted drilling rig Transocean Enabler, utilising TRANSCO 17 1/2" x 26" x 36" x 7 Cutter Integral Body Hole Openers (Boulder Buster) with TRANSCO 10” T25 Patented Field Replaceable TCI cutters.

Click on the link for more details :
https://lnkd.in/eQf7Jpm

1sta

Quality is integral to everything we do. Quality is everyone’s responsibility. TRANSCO will continuously improve its customer service to better satisfy the needs of its customers and will deliver to them—on time and every time—defect-free products and services conforming to customer requirements and industry standards .

api spec q1 0831qms registered iso 9001 20157 1 1081